Showing posts with label deadlines. Show all posts
Showing posts with label deadlines. Show all posts

Wednesday, April 11, 2012

Interruptions -- Our Daily Lot

The other day I received an e-mail from a current client requesting a reply ASAP on whether I could take this project. The catch? It was 4:30 am in New York. Since I am usually in bed at that time, I didn't reply until several hours later. By then the project had been assigned to another translator.


Later that day, another called client asking why I hadn't yet replied to their e-mail about a potential project. Turns out the e-mail had been sent 5 minutes before the call and hadn't even arrived in my inbox yet. I was in the middle of working on another project, but my train of thought had already been interrupted. So I checked that e-mail immediately, negotiated the project, received and checked the files, etc. Only to find out an hour later that this new project had been double assigned and I shouldn't work on it after all.


Next, a Skype message popped up on my computer, from yet another client, wanting me to turn a small project around within a few hours. When I replied that I couldn't accommodate that time frame because I was already working on other projects, the answer was "But it's only 300 words, so it shouldn't take long, and I need it right away." By the way, no rush fee was offered.


Books on time management suggest sending phone calls to voice mail, turning off Skype and checking e-mail at set times to minimize distractions. That may work for corporate managers with secretaries, but we freelance translators cannot simply be unreachable for lengthy periods of time. As the first example shows, we lose out on work that way (I am still not getting up at 4 am to check my e-mail, though).


So what can we do to deal with these interruptions? I generally limit my e-mail checking to once an hour or so, unless I am expecting a file or response from a client. When I remember to do so, I set Skype to "do not disturb" before working on a project. And I usually decline same-day projects, even if they are short, unless additional compensation is offered.


The real answer, of course, is better scheduling on the end client and/or agency's part, so enough time for translation is included in the project plan. Unless you are a medical interpreter in an emergency room or work in disaster management, there is really no good reason why translation projects have to be so urgent.

Wednesday, June 22, 2011

Feast or Famine: the Freelancer's Eternal Lament

Last week, I wrote about trying to market myself. This week, I wish fewer clients wanted my services. Earlier this week I was working on three projects simultaneously while a fourth one was waiting in the wings. Now I'm down to two projects and had to decline two more because I can work only so many hours in a week. Besides, sometime this weekend I have to catch up on invoicing and following up with people I met lately at a couple of networking events.

That dilemma of too much work one week, none the other, is, of course, familiar to any freelancer. But the problem seems to be exacerbated in the translation industry where many projects have extremely tight deadlines. Even if a project were large enough to keep one translator busy for a few weeks, it usually needs to be done so quickly that it is divided up between different translators rather than spread out over time. Not only does this worsen each individual translator's uneven cycle of work, it opens a whole other host of problems in terms of different writing styles and terminology.

This brings me back to the fact that translation is frequently an afterthought at the end of a production cycle, rather than a planned step with appropriate deadlines. I have written about this before, but it bears repeating: end clients need to learn that the translator needs time to provide a quality product and that they therefore must build that time into their project plans. But as long as end clients can get 24-hour turnaround on translating 10,000 words, they won't learn. So language service providers -- agencies, but also translators -- must educate them about the time involved and refuse to do rushed, low-quality jobs.

That, unfortunately, does not appear to be where the profession is headed. I, for one, am looking for direct clients where I can negotiate terms and deadlines in advance. That, however, only works for the precious few companies that don't already have a contract with an agency and don't need their text in 20 different languages. It remains to be seen whether I can actually find -- and convince to hire me -- enough such clients so I can get out of the rat race translation has become. Stay tuned for updates ...

Wednesday, May 4, 2011

Deadlines, deadlines ...

Galina Kakhoun recently asked in the Translators Worldwide forum on LinkedIn whether deadlines had gotten shorter over the past 10 years. I do think that deadlines have gotten tighter.

In part that is because business (and private) life in general has accelerated, at least in the industrialized countries. Some of this is due to technology improvements, which have also enabled translators to work faster (think CAT tools). Part of the problem, however, is that clients have unrealistic expectations, coupled with disregard for quality.

I just saw a posting for an 8,800-word legal text to be translated literally overnight. Such speed is only possible if absolutely no terminology is researched, and the first draft is not edited/proofread at all. We translators need to educate clients about the time and effort it takes to produce a good translation and refuse jobs on too-tight deadlines. If the poster of this job is consistently told that the translation cannot be produced in that timeframe, he/she will change the deadline and, hopefully, learn to set a more realistic one next time.

We also need to get better at negotiating deadlines. Often the initial deadline is flexible -- the client just doesn't tell us so. Faced with a Friday 5pm deadline, for example, we can ask for Monday morning instead; the translation would likely simply sit in someone's inbox over the weekend, anyway. If a client asks for a certain deadline and I have already committed to other projects, I'll explain the situation (without specifics, of course) and ask whether the deadline can be moved by a couple of days. Often, it can.